Build a Crane Parts List Your Workshop Can Use

[ October 16, 2026 ]

A crane parts list is ready for purchasing when every line identifies the machine, the component, the evidence for that identification and the quantity the workshop needs. A part number by itself leaves too much room for interpretation. Give each item a permanent work order line number so the mechanic, purchaser, supplier and receiving clerk can talk about the same item without forwarding the whole file.

The previous guide covered the information to capture from an EPEC 2024 controller. Here that label photo becomes one piece of a crane maintenance work order. The workshop still has to say which machine the photo came from, where the controller sits and whether the requested scope includes anything beyond the controller.

Separate what the workshop saw from what it wants to order

Start with two fields. In the observation field, write what the workshop can document, such as a missing label, a visible connector issue or a fault description supplied by the technician. In the purchase request field, state the component and quantity the maintenance lead has approved for sourcing. If diagnosis is still in progress, record that status. A fault report that mentions the controller belongs in the evidence file and should never quietly become a purchase instruction.

Record the fleet asset number and the equipment serial reference above each line. A branch may have two machines with similar model markings. A phone photo forwarded without the asset number can easily migrate into the other machine's folder. Put the asset ID in the image name and include one wider photo that establishes the component's location. Keep the close-up so the purchaser can read the characters without guessing.

Two controller records can lead to two different enquiries

The catalog lists a XCT110 controller 803746293 / IMCT3654 under 803746293 and IMCT3654, and a separate XCT110 controller 83901050 / 85600SNK listing under 83901050 and 85600SNK. These are useful examples of why the crane model alone is a weak identifier. On an illustrative job, put a photo carrying 803746293 on the line belonging to the asset where it was taken. Keep an image carrying 83901050 with its own asset and line. Ask the supplier to answer against each complete code, including any second identifier visible on the label.

If the workshop asks for a spare alongside the immediate replacement, record the split. A request for one repair unit and one shelf spare gives the buyer a choice if the supplier can only cover part of the order. If setup, programming or a related harness is part of the requirement, make each responsibility explicit before a quote is approved.

Use one practical handover record

A short purchasing brief can carry the work order and line ID, machine and assembly references, exact label transcription, photo filenames, quantity, need-by date, and the name of the person who can resolve a technical question. Leave a place for the supplier's quoted reference beside the original controller part number. These two values remain independently searchable when they differ.

Decide what can leave the workshop today

Give each line one of three outcomes at the handover meeting. A confirmed request can go out for quote. An identification request can go out for evidence with the commercial release blocked. A repair decision still with the workshop stays internal until the maintenance lead defines the need. This keeps a helpful supplier response from turning into an accidental commitment.

At handover, ask the purchaser to read a line without opening the maintenance chat. They should be able to explain what to quote, how many are needed, which asset is involved and who owns a discrepancy. Save that version before looking for crane replacement parts so later edits have a clear starting point. In the next article, the same line ID follows the request into the parts diagram, where one machine may have several assemblies that share similar descriptions.

The EPEC controller identification guide shows what evidence belongs on an electronics line. Use the crane assembly diagram guide to record the parent assembly and callout on the same work order. For a gauge enquiry, see the fuel sender and gauge checks.