XCMG QY50K Third, Fourth and Fifth Boom Assembly 03
Shipping three nested boom sections requires clarity about what assembly 03 includes and how alignment will be checked.
Customer priority: Confirm boom version, section geometry, wear pads and included hardware.
Fitment Evidence
Original reference: Boom assembly 03
Machine model, serial number and installed position
Photos of labels, connectors/ports and mounting
Key dimensions and mating-component details
Why Replacement May Be Needed
Wear, damage or poor operation should be confirmed against the complete assembly before ordering.
Workshop and Installation Notes
Compare the removed part, install to the service procedure and check operation under controlled conditions.
Related reference: XCMG Truck Crane Parts
Buyer Questions
What should I send for confirmation?
Provide the machine plate, old-part label, wide installation photo and close-ups of every interface.
Can appearance alone confirm fit?
No. Labels, dimensions, interfaces and machine configuration must agree.
What is checked after installation?
Fit, movement, fastener security and normal operation.
Export packing: Interfaces are capped or protected, identification is preserved and the part is secured for export.