Product Introduction
This group covers control-system components used on XCMG QY65K, QY70K, and QY25K truck cranes, spanning electrical protection and hydraulic pilot operation.
Electronic Fuse Box with EPEC Control (QY65K / QY70K)
The fuse box distributes and protects electrical power across the crane’s control circuits. On QY-series cranes, the operating cab electrical system is a dedicated assembly listed in the parts manual, covering fuses, relays, and control interfaces. An EPEC-based control architecture integrates electronic proportional control with the fuse distribution function, allowing the crane’s PLC and remote-control outputs to be powered and protected within a single enclosure. Fuse box assemblies for QY65K are catalogued under the cab electrical schematic section, confirming the fuse box is a serviceable unit within the operator cab electrical system.
Hydraulic Joystick (QY25K)
The hydraulic joystick, also referred to as a pilot control valve, translates operator hand movements into hydraulic pressure signals that actuate the main control valves. QY25K cranes are equipped with a pilot hydraulic control system: gently pushing the two armrest-mounted joysticks completes all crane operations with precision. The joystick is a wear component, and leakage at the joystick is a known service issue on QY25K machines; repair options include replacing internal seals or the valve core, or replacing the complete unit.
Pilot Joystick (QY25K)
The pilot joystick operates on low-pressure hydraulic oil to control the high-pressure main circuits. On QY25K cranes, the pilot system provides proportional, precise control compared with mechanical lever operation. Left and right joystick assemblies are listed under part numbers 20100417 and 20100418 for the QY25K5 and related models, indicating a paired left/right configuration. Maintenance typically involves checking for external leakage, seal integrity, and free movement of the joystick ball joint; contaminated or degraded hydraulic oil accelerates seal wear and should be maintained according to the crane’s service schedule.